Project include:
- Tree removal
- New roof
- New windows
- New exterior railing,
- New driveway and patio
- New kitchen that opens up to the family room
- 2 bathroom remodels
- New trim
- New lighting
- New flooing upstairs and down
- AC installed
- Gas fireplaces installed upstairs and down + chimney lined
Here is the house moment after closing.
Here it is a few hours later after many trees came down and brush got cleared out.
We have also taken the awnings off (still on in the pic though).
Entryway
Kitchen
View into the dining room from the family room.
Upper family room.
Bedroom.
Upper bathroom.
Entryway with kitchen on the left, and familyroom straight ahead.
Lower level family room.
Lower level kitchen (this will turn in to the 4th bedroom).
Lower level bedroom.
Lower level bathroom (pink tiles are now mostly off).
Here is a work in progress photo with the kitchen now opening up to the dining room. These cabinets are all out now.
We will try to take lots of pictures along the way of our progress!
2 comments:
Fun, Linds! Do you plan on renting / selling or eventually moving there? I know you said you'd only move one more time...
Enjoy!
I can't wait to see what it looks like! The house looks like it has fabulous bones. You guys are so brave :)
Post a Comment